Firstly, the ground is excavated and leveled. The canals is excavated for place mould of concrete bound. The beam contain 8 to 12 iron bars. To evacuate the water off the ground, we put the tubes in depth of 30 cm and The distance and place enough slope are very important things in this stage. After that we set 4 inches anchorage pipes vertically in the boundary.BS 20 concrete is filled into the moulds. After that, all surface will be filled with gravel.
Iron poles are soldered anchor tubes that is placed to the limit. Reinforcement bars will be soldered diagonally to the horizontal tubes at all corners. The poles also will be strengthened by further poles. To strengthen the sides, transverse pipes is soldered to the side bars and the bars at the back of the goal posts. After that we will install lighting lamps to the lateral sides of field with stairs and we start installation of entrance door and a pair of goal posts. We paint each iron equipments. Then we cover the field and goal posts with polyamid net. Finally we set up floodlight and other electrical materials.
Firstly, we cover up gravelled area with the felt. Artificial grass will be spread on the surface already covered with felt. Artificial grass carpets will be glued by polyester tape by using special adhesives. The adhesives used are double component polyurethane adhesives. After that we dump silica sand to the grass and finally the field is filled with the black granules or colored EPDM.