Indoor
Soccer Field Construction

The steel structure of the closed field is calculated according to the wind, snow and raining conditions. When the plans terminated and aşş of the static calculations are certain, We start the production of the steel components of the field. It is completed in 4-5 weeks and is prepared to install. Installation of the steel construction is done within 2 weeks.
artificial grass carpet
Get

A Free Quote Now

indoor football field construction

After that we start installation of covering materials. Covering materials are; PVC membrane cover, tarpaulin membrane cover, sandwich panel cover and steel sheet cover During the construction of the coverings, we work for installation of artificial grass, flooglights and electric equipments, PVC covered galvanised fence and net installations can be completed simultaneously. All these works takes about 6-8 weeks. Soccer Pitch Dimensions: The dimensions of the field is changeable according to the budget and availability of the land. The dimensions most prefered are in between 20mX40 and 30mX50m . Any way, the best dimension is accepted to be as 30mX50m.

Steel Frame Indoor Soccer Field Construction

  • First Stage : Infrastructure of Field
  • Firstly, the ground is excavated and leveled. The canals is excavated for place mould of concrete bound. The beam  contain 8 to 12 iron bars. To evacuate the water off the ground, we  put the tubes in depth of 30 cm and The distance and place enough slope are very important things in this stage.

  • After that we set   4 inches  anchorage pipes vertically in the boundary.BS 20 concrete is filled into the moulds. After that, all surface will be filled with gravel.
  • Second Stage : Wire Fencing and  Nets
  • Iron poles are soldered anchor tubes that is placed to the limit. Reinforcement bars will be soldered diagonally to the horizontal tubes at all corners.  The poles also will be strenghtened by further poles. Steel frame will be covered by a tent or fiberglas covering.To strenghten the sides, transverse pipes is soldered to the side bars and the bars at the back of the goal posts.  After that we will install lighting lamps to the lateral sides of field with stairs and we start installation of entrance door and a pair of goal posts. We paint each iron equipments. Then  we cover the field and goal posts with polyamid net. Finally we set up floodlight and other electrical materials.
  • Last Stage : Football Field Construction
  • Firstly, we cover up gravelled area with the felt. Artificial turfs will be spread on the surface already covered with felt. Artificial grass carpets  will be glued by polyester  tape by using special adhesives. The adhesives used are  double component polyurethane adhesives. After that we dump silica sand to the grass and finally the field is filled with the black granules  or colored EPDM.